Altai Jikeprin International Ice and snow tourism base Holiday hotel project
This project 4 floors on the ground, 1 times underground, cornice height of 21.27 meters, length of 167 meters, width of 144.5 meters, structural form of steel frame, steel structure mainly adopts hot rolled H-section, welding H-shaped section, the project is located in a special geographical environment, short time limit, large volume, material transportation is difficult, and all are special-shaped structure, in the extremely cold weather, construction difficulty is very big.
Jan 22,2025
New rural renovation of prefabricated houses
The new rural reconstruction project is based on the principle of farmers' autonomy, voluntary enterprise and government support, with farmers as the main body of housing construction and enterprises with prefabricated products in rural areas voluntarily participating, to build a batch of prefabricated rural housing with excellent performance, beautiful style, color coordination, perfect function and obvious advantages of construction period. Our company provides a series of schemes for the project, such as standardized design of structural rural housing, factory production, assembly construction, integrated energy-saving decoration, etc., to ensure that pilot farmers can truly feel the advantages of prefabricated rural housing in terms of construction performance, style, function and construction period, and lead the new fashion of rural housing construction.
Jan 22,2025
Xiongan high-speed railway station building project
The main body of the building has a total of five floors, including three floors above ground, two underground floors, and local mezzanine. The total construction area of the house is about 450,000 square meters, and the platform canopy projection area is more than 100,000 square meters.
Jan 22,2025
Wuzhong to Zhongwei Railway Zhongwei South Station
The platform awning axis span is about 60 meters, the axis length is 450 meters, the height is 14 meters, the amount of steel is about 4000 tons; Steel structure is mainly pipe tree fork structure, processing difficulty is high, construction welding amount is large; The steel column is composed of cross steel column and pipe tree fork structure. The steel beam is welded H-beam. The whole roof of the station room is steel box girder and diamond cross, which is extremely difficult to construct. The workload of accurate measurement is large in the construction process, and 650 crawler cranes are used for hoisting.
Jan 22,2025
The newly-built Yinchuan Xi'an Railway (Shaanxi section) is 162.37km long, passing through Weiyang District, Economic Development Zone, Daxian Cultural and Sports Functional Zone, Qinhan New City in Xixian New Area, Weicheng District, Qindu District, Xingping City, Liquan, Qianxian County, Yongshou, Bin County in Shaanxi Province, and entering Qingyang City in Gansu Province. Five new stations will be built with a target speed of 250km/h, and infrastructure will be reserved for speed increase. The preliminary design estimate for the Shaanxi section is 22.43 billion yuan, with a construction period of five years.
Jan 22,2025
Steel box girder project of No.2 section of Jingxiong high-speed SG2 Contract
The owner of SG2 standard project of Hebei section of expressway from Beijing to Xiongan New Area is Hebei Expressway Administration Bureau. The project is divided into six contract sections. Chongqing Communications Construction (Group) Co., Ltd. is responsible for the construction of the second contract section. Chongqing Communications Construction (Group) Co., LTD. (hereinafter referred to as Chongqing Communications Construction Group) Co., LTD. (hereinafter referred to as Chongqing Communications Construction Group Co., LTD.). The construction scope includes the SG2 Dongwan Interconnecting A, B, C, D and G ramp bridge of the Hebei section of the expressway from Beijing to Xiongan New Area and the steel box girder of the Longzhuohigh-speed overpass.
Jan 22,2025
Daheihe Cable-stayed Bridge project of Jinsheng Road, Hohhot City
Daheihe Cable-stayed Bridge is a key control project of Jinsheng Expressway project in Helinger New District, Inner Mongolia. This type of bridge adopts the 135+135m special-shaped arch tower single-tower double-cable-plane cable-stayed bridge scheme. The tower and pier are consolidated without auxiliary piers. The main tower of this bridge is 4100 tons, the main bridge is 4300 tons, and the approach bridge is 2600 tons. The main pier of the bridge tower is set on the central bank of the river, and the single hole is respectively across the north and south sides of the river and the river patrol road on the shore. The tower is a double oval shaped four-arch ring type cable tower, with a height of 86m. The cable adopts double cable plane fan-shaped arrangement, the upper main beam adopts steel-mixed composite beam, the cable adopts parallel steel wire bundle, the main pier adopts pile group foundation, and the pile foundation is bored pile foundation.