< 1...353637...42 >

Jan 22,2025

Inner Mongolia Guoxuan Zero Carbon Technology Co., Ltd. Standardized Factory Building

Feidong Guoxuan New Materials Co., Ltd. Wuhai Graphitization (Phase I) 1 # and 2 #, with individual plant widths of 50 meters and 36 meters. The weight of the heaviest single component (middle steel column) is 9.35 tons, and the weight of the side columns is 6.24 tons. The length of the steel column is 22.95 meters, with a column spacing of 7.5 meters. The weight of a 50 meter span beam is about 9.75 tons, and the weight of a 36 meter span beam is about 4.55 tons.


Jan 22,2025

Shuangliang Silicon Materials Co., Ltd. 40GW Monocrystalline Silicon Wafer Project

Production and installation of color steel plate enclosures for all roofs and walls of the steel structure factory building east of the central axis of Single Crystal Factory No. 3, as well as roof purlins. Wall purlins, supports, braces, roof panels, wall panels, sandwich insulation cotton, gutters, flashing, brackets, edging, closures, ridge tiles, etc.


Jan 22,2025

Hohhot Jingdong Logistics Park Asia **** logistics warehousing project

"Jingdong Asia ****" is a key project of Jingdong Group to build the automation operation center into a modern operation center with the largest building scale and the highest degree of automation in the B2C industry in Asia. The project is located in the core area of Helinger New District, covering a total area of 412 mu and a total construction area of 210,000 square meters. The project is divided into the first and second phases of construction, and the first phase of construction area is 75,000 square meters. The main construction contents include Jingdong E-commerce business center, smart logistics demonstration base, regional procurement center, Jingdong Inner Mongolia regional headquarters and demonstration base of unmanned aerial vehicle, unmanned vehicle distribution and unmanned supermarket. The project adopts domestic leading intelligent robots and other warehousing technologies to realize the whole process and multi-scene application of artificial intelligence, unmanned sorting, unmanned vehicle, unmanned patrol and unmanned aerial vehicle, and strives to build the world's most intelligent logistics park.


Jan 22,2025

Montai Dalat 900,000 tons/year aluminum strip project

The project will support the construction of power workshop, raw material preparation workshop, casting workshop, casting workshop, etc., with a total investment of about 9.1 billion yuan. The project will be constructed in two phases, and the first phase is scheduled to be put into operation at the end of September 2017. AA3004 aluminum magnesium manganese plate is used for the project's enclosure products, which is a cost-effective roofing and exterior wall material. It has the advantages of light weight, high strength, diverse surface treatment, beautiful appearance, corrosion resistance, easy installation, environmental protection and so on. At the same time its vertical locking system does not need to glue, 100% structural waterproof. At the same time, it is very suitable for harsh climate environment, such as strong wind, rain and snow. Moreover, the vertical edge of the vertical locking system is 65mm, giving the building a rhythmic and modern appearance.


Jan 22,2025

Shanshan Technology Baotou integrated production base with an annual output of 100,000 tons

Baotou integrated production base with annual output of 100,000 tons is the first production base of negative electrode materials of Shanshan Technology, as well as the world's best production base of lithium cathode materials. The integrated base is from raw material processing, raw material processing, graphitization, carbonization to finished product processing, set five processes in one negative electrode material production line. The total investment of this project is 3.8 billion yuan, covers an area of about 980 mu, the total construction area is about 330,000 square meters, steel structure construction area of 42,600 square meters.


Jan 22,2025

Ningyang Parts Industry Park and Advanced Green Intelligent Manufacturing Demonstration Factory Project

This project is divided into three single story portal steel structure factories, one 3-story brick and concrete structure comprehensive office building, as well as supporting facilities such as production auxiliary rooms, security guards, raw material and finished product warehouses, acid pickling workshops, and fire pump rooms. The building area of the portal steel structure factory is 41610 square meters; The comprehensive office building covers an area of 6664 square meters; Other ancillary facilities covering an area of 17576 square meters; The total construction area is 65849 square meters.


Jan 22,2025

Inner Mongolia Huiteng Annual Production 600000 Tons Ethylene Glycol Project

This project is a gasification frame steel structure project for Huiteng's annual production of 600000 tons of ethylene glycol steel. The main body of the gasification frame steel structure is connected by cross columns, box columns, and H-shaped steel beams, mainly using flange plate groove welding connection method. The gasification frame has a reinforced concrete structure at an elevation of 32 meters and below, and a steel frame structure from 32 meters to 95 meters, with a total steel consumption of approximately 3500 tons.


< 1...353637...42 >

Book a meeting

We look forward to meeting with you

Submit Message