Back to Overview

Montai Dalat 900,000 tons/year aluminum strip project

Jan 22,2025

Montai Dalat 900,000 tons/year aluminum strip project

Client: Inner Mongolia Mengtai Coal Power Group Co., LTD

Project address: Daqi, Ordos City

Construction area: about 250,000 square meters

Project overview: The project will support the construction of power workshop, raw material preparation workshop, casting workshop, casting workshop, etc., with a total investment of about 9.1 billion yuan. The project will be constructed in two phases, and the first phase is scheduled to be put into operation at the end of September 2017.

AA3004 aluminum magnesium manganese plate is used for the project's enclosure products, which is a cost-effective roofing and exterior wall material. It has the advantages of light weight, high strength, diverse surface treatment, beautiful appearance, corrosion resistance, easy installation, environmental protection and so on. At the same time its vertical locking system does not need to glue, 100% structural waterproof. At the same time, it is very suitable for harsh climate environment, such as strong wind, rain and snow. Moreover, the vertical edge of the vertical locking system is 65mm, giving the building a rhythmic and modern appearance.

Contact Us

E-mail :
183597530@qq.com

WhatsApp:
+86-13810577811

Address:
No. 4 Fengzhi Road, Binhe New District, Baotou Rare Earth High tech Zone, Inner Mongolia Autonomous Region

Book a meeting

We look forward to meeting with you

Submit Message