Ethylene Glycol Plant Steel Structures, Ordos (Dalat) Pipe-Racks & Process Frames Zhonghengfeng Construction Group
Zhong Heng Feng Construction Group engineered and erected steel pipe-racks and process frames for Inner Mongolia Rongxin Chemical’s ethylene glycol complex in Ordos (Dalat), including DMO synthesis/purification units and ethylene-glycol separation frameworks. The project integrates high-reliability steel structures with process, utility, and maintenance systems.
Located in Sanshang Liang Industrial Park, Dalat Banner, Ordos City, the Inner Mongolia Rongxin Chemical Complex is a circular-economy project producing ethylene glycol and related products. Zhong Heng Feng Construction Group Co., Ltd. delivered heavy industrial steelworks for multi-level pipe-racks, equipment platforms, and separation/purification frames—coordinated with process, piping, and electrical systems to ensure safe, continuous operation.
Client & Location
Owner: Inner Mongolia Rongxin Chemical Co., Ltd.
Site: Ordos City, Dalat Banner (Sanshang Liang Industrial Park), Inner Mongolia, China
Production Targets (Owner Data)
• Ethylene Glycol: 400,000 t/y
• DMMn Glycol Devices: 300,000 t/y
Steel Tonnage (Overall Complex)
• Approximate total structural steel across the complex: ~13,000 tons
Scope of Work
• Multi-level steel pipe-racks linking process units, storage, and utilities
• Process frames for: dimethyl oxalate (DMO) synthesis and compositing, DMO purification & water separation, ethylene-glycol compositing, and ethylene-glycol separation/purification
• Equipment platforms, access towers, walkways, handrails, and maintenance stairs
• Anchor-bolt setting, base-plate leveling, grouting, and dimensional control
• Corrosion-protection systems (surface prep + multi-coat paint/galvanizing where specified)
• Lifting/installation of vessels and large-bore piping supports in congested areas
Engineering Highlights
• High-density nodes: branched pipe-rack connections with significant welding volumes and full-penetration details where required
• Vibration & thermal design: bracing layouts, expansion/sliding details, and spring supports coordinated with process engineers
• BIM coordination: clash detection with piping, cable trays, and HVAC to secure clearances and maintenance envelopes
• Quality & HSE: WPS/PQR-qualified welding, NDT on critical joints, coating DFT verification, and controlled lifting plans
Deliverables
• Shop drawings and erection plans
• Fabrication, blasting/painting, and logistics
• On-site erection, survey control, and as-built dossiers
• Turnover documentation aligned with plant QA/QC
Key Figures
• Overall complex structural steel: ~13,000 t
• Major units covered: DMO synthesis & purification; ethylene-glycol compositing & separation frames
• Structural types: moment-frame pipe-racks, braced frames, equipment platforms, composite deck areas (where specified)
For chemical and petrochemical steel structures, from pipe-racks to process frames, Zhonghengfeng Construction Group Co., Ltd. provides end-to-end engineering, fabrication, and erection. Contact us for a tailored proposal and schedule.
FAQ
1) What is the scope of Zhong Heng Feng’s work in this project?
We undertook the design coordination, fabrication, and installation of steel structures including pipe-racks, process frameworks, and equipment platforms.
2) Where is the project located?
The project is located in Sanshang Liang Industrial Park, Dalat County, Ordos City, Inner Mongolia.
3) What is the total steel usage?
The project required approximately 13,000 tons of structural steel.
4) What are the key structures involved?
The works include ethylene glycol and DMO unit frameworks, separation and purification systems, and major steel platforms integrated with plant operations.
5) How is construction quality and safety ensured?
Through certified welding procedures (WPS/PQR), non-destructive testing (UT/MT/VT), strict dimensional checks, and adherence to HSE standards.
6) How are corrosion protection and durability addressed?
Steel structures are treated with surface blasting, protective coatings, and hot-dip galvanizing where required, ensuring long service life in industrial environments.